70.16. The verification of the project report must(1) be conducted in accordance with ISO 14064-3 and according to procedures that allow a reasonable assurance level within the meaning of that standard to be obtained; and
(2) include at least one project site visit, confirming the implementation of the project and the proper operation of the measurement and monitoring instruments, by the verifier designated by the verification organization and accompanied by the promoter and, where applicable, the member party to the aggregation concerned, during each verification for each place concerned by the project.